tutorlino

Grade 8: linear functions practice

What this covers

8 practice problems

8.F.B.4

1. A line passes through (2, 5) and (6, 13). What is its slope?

Show the answer

2

  1. Slope = change in y ÷ change in x.
  2. Change in y: 13 − 5 = 8. Change in x: 6 − 2 = 4.
  3. Slope = 8 ÷ 4 = 2.
8.F.A.1

2. For y = 4x − 7, what is y when x = 3?

Show the answer

5

  1. Put 3 in for x: y = 4 × 3 − 7.
  2. 4 × 3 = 12, and 12 − 7 = 5.
  3. y = 5.
8.F.B.4

3. A plumber charges $45 for a visit plus $30 per hour. What is the total cost of a 3-hour job?

Show the answer

$135

  1. The cost is y = 30x + 45, where x is the number of hours.
  2. Put 3 in for x: y = 30 × 3 + 45.
  3. 90 + 45 = 135, so the job costs $135.
8.F.B.4

4. Write the equation of the line through (1, 6) and (3, 10) in the form y = mx + b.

Show the answer

y = 2x + 4

  1. Slope m = (10 − 6) ÷ (3 − 1) = 4 ÷ 2 = 2.
  2. Put (1, 6) into y = 2x + b: 6 = 2 + b.
  3. b = 4.
  4. The equation is y = 2x + 4.
8.F.A.2

5. Function A is y = 5x + 1. Function B has the table x: 0, 2, 4 and y: 3, 9, 15. Which function has the greater rate of change?

Show the answer

Function A (rate 5)

  1. The rate of change of A is the slope, 5.
  2. For B: y goes up 6 when x goes up 2, so the rate is 6 ÷ 2 = 3.
  3. 5 is greater than 3, so Function A has the greater rate (5).
8.F.B.4

6. A candle is 12 inches tall. It burns 1.5 inches per hour. How tall is it after 4 hours?

Show the answer

6 inches

  1. The height is y = 12 − 1.5x, where x is hours.
  2. Put 4 in for x: y = 12 − 1.5 × 4.
  3. 12 − 6 = 6, so the candle is 6 inches tall.
8.EE.C.7.b

7. Where does the line y = 2/3x − 4 cross the x-axis? Give the x-value.

Show the answer

x = 6

  1. On the x-axis, y = 0: 0 = 2/3x − 4.
  2. Add 4 to both sides: 2/3x = 4.
  3. Multiply both sides by 3/2: x = 6.
8.EE.B.5

8. Train A travels d = 60t miles in t hours. Train B's distance-time graph is a line through (0, 0) and (2, 110). Which train is faster, and by how much?

Show the answer

Train A, by 5 miles per hour

  1. Train A's speed is the slope of d = 60t: 60 miles per hour.
  2. Train B's speed is 110 ÷ 2 = 55 miles per hour.
  3. 60 − 55 = 5, so Train A is faster by 5 miles per hour.

5-minute level check

5 questions

Standards: Common Core State Standards for Mathematics.

Claim your child's free first session now